7024166/HYPLCUS11PAFIA
Simpson Racing Hybrid Pro Lite
- Brand Simpson Racing
- Model HYPLCUS11PAFIA
- Availability Available To Order
SFI 38.1 certified, FIA 8858-2010 approved, the Hybrid Pro Lite is the ultimate in safety and comfort. The Hybrid Pro Lite's light-weight design and carbon fiber construction provides maximum comfort and maneuverability with superior strength.All of Simpson's Hybrid Series head restraints are designed for easily exiting the car without the danger of being entangled in other gear by offering the lowest profile of any comparable device. This device comes with optional patented SAS (Seatbelt Anchor System) for even greater coverage in flips, barrel rolls, and side impacts. When the worst happens, you'll have the same great protection every time. Ships race ready with Quick Release and D-ring Helmet Anchors.
References
| Brand | Simpson Racing |
| Category | Safety Equipment |
| Product Code | 7024166 |
| SKU: | HYPLCUS11PAFIA |
Specifications
| Brand | Simpson Racing |
| Emission Code | 6 |
| Product Type | Head and Neck Restraint |
| Size | Custom |
| Tether System | Post Anchors / Tether Kit |
| Seatbelt Anchor System | No |
Specifications
| Brand | Simpson Racing |
| Emission Code | 6 |
| Product Type | Head and Neck Restraint |
| Size | Custom |
| Tether System | Post Anchors / Tether Kit |
| Seatbelt Anchor System | No |
Loading...









